null
XDP

XDP XD475 REMANUFACTURED 7.3L AE FUEL INJECTOR FOR 99.5-03 FORD SUPERDUTY WITH 7.3L POWERSTROKE ENGINE

(No reviews yet) Write a Review
SKU:
XD475
MPN:
XD475
Shipping:
Calculated at Checkout
  • XDP XD475 REMANUFACTURED 7.3L AE FUEL INJECTOR FOR 99.5-03 FORD SUPERDUTY WITH 7.3L POWERSTROKE ENGINE
  • XDP XD475 REMANUFACTURED 7.3L AE FUEL INJECTOR FOR 99.5-03 FORD SUPERDUTY WITH 7.3L POWERSTROKE ENGINE
$164.95

Description

The XDP Remanufactured 7.3L AE Fuel Injector XD475 will replace the damaged #8 Long Lead injector in your 1999.5-2003 Ford 7.3L Powerstroke. With years of manufacturing experience and over 30 million diesel fuel injectors produced to date, you can be sure you are getting a quality product.

By surpassing the manufacturers' current design specifications, these injectors have less than 0.2 percent warranty rate. Every injector is comprehensively tested for nozzle flow and needle lift as well as opening operation and leakage.

Additional tests include shot-to-shot flow meters, poppet seat leakage test, and injection timing measurements for best-in-class testing. Quality and Testing Advanced end-of-line testing, delivery, leakage and opening characteristics.

Precision remanufacturing process ensures highest quality, reliability and performance. Opening clearances are set to strict specifications; validated with engine and vehicle testing and compared to OE product.

Features:

  • Stock HP and Flow Rating
  • Best In Class End-Of-Line Testing Nozzles
  • Tested For Flow, Leakage and Needle Lift
  • In-Line Error Proofing Incorporated In Assembly Process

The XDP XD475 Remanufactured 7.3L AE Fuel Injector is engineered specifically for Ford SuperDuty trucks equipped with the renowned 7.3L Powerstroke engine, spanning model years 1999.5 to 2003. Designed as a direct replacement for the damaged #8 long lead injector, this product stands out in a crowded marketplace by adhering to the highest manufacturing standards.

Leveraging years of experience and an impressive track record of producing over 30 million diesel fuel injectors, XDP guarantees exceptional quality and durability. Each injector undergoes thorough testing to ensure optimal performance. From nozzle flow and needle lift evaluations to in-depth leakage assessments, every unit is meticulously scrutinized to exceed original factory specifications. With a remarkable warranty rate of less than 0.2 percent, confidence in performance is assured.

The remanufacturing process emphasizes precision and reliability. Opening clearances are tightly regulated and validated through extensive engine testing, ensuring that the XD475 injector meets or surpasses original equipment (OE) standards. This commitment to quality is reflected in its stock horsepower and flow ratings, designed to provide the dependable power and efficiency that drivers expect.

To fortify its reliability, advanced error-proofing techniques are integrated into the assembly process, ensuring that only the highest caliber injectors reach your vehicle. Each injector promises best-in-class performance, thanks to rigorous end-of-line testing that evaluates critical characteristics such as delivery rates and injection timing.

Elevate your Ford SuperDuty's performance by choosing the XDP XD475 Remanufactured 7.3L AE Fuel Injector, a trusted solution for restoring functionality, enhancing efficiency, and ensuring a smoother ride.

View AllClose

Warranty Information

1 Year / Unlimited Mileage
View AllClose

0 Reviews

View AllClose