null
DYNOMITE DIESEL

DYNOMITE DIESEL DDP.AE-2 FORD 99-03 7.3L STAGE 2 LONG LEAD INJECTOR SET 25 PERCENT OVER

(No reviews yet) Write a Review
SKU:
DDP.AE-2
MPN:
DDP.AE-2
Shipping:
Calculated at Checkout
$5,200.24

Description

Enhance the performance of your Ford 7.3L Powerstroke engine with the DYNOMITE DIESEL DDP.AE-2 Injector Set. This stage 2 long lead injector set boasts a brand new construction, ensuring optimal performance without compromise. Each injector is meticulously balanced and features 140cc injector bodies matched with 25 percent over nozzles for improved power output.

Experience a remarkable 75-100 RWHP increase over stock injectors when paired with suitable modifications, making it an ideal choice for hot street trucks engaged in light-duty towing. For those who frequently tow heavy loads, a turbo upgrade is highly recommended to maximize the benefits of this injector set.

Specifically designed for Ford models from 1999 to 2003 with a 7.3-liter Powerstroke engine, this injector set is tailored to deliver exceptional performance and reliability. Please note that this set is optimized for vehicles with the long lead injector in cylinder #8. For vehicles without this injector or for those unsure, we recommend the DYNOMITE DIESEL DDP AD-2 injector set for a seamless fit.

Prepare your Ford Powerstroke for elevated power and efficiency with the DYNOMITE DIESEL DDP.AE-2 Injector Set - a new, high-quality solution that guarantees an outstanding driving experience. Please be aware that this product is not available for sale in California, ensuring compliance with relevant regulations. Elevate your driving experience with this exceptional injector set tailored to meet your high-performance needs.
View AllClose

Warranty Information

1 Year
View AllClose

0 Reviews

View AllClose