DYNOMITE DIESEL
DYNOMITE DIESEL DDP.AE-1 FORD 99-03 7.3L STAGE 1 LONG LEAD INJECTOR SET 15 PERCENT OVER
- SKU:
- DDP.AE-1
- MPN:
- DDP.AE-1
- Shipping:
- Calculated at Checkout
Description
Ford 99-03 7.3L Powerstroke Injector Set: Brand new (not reman) stage 1 injector set WITH long lead injector for cylinder #8. New injectors have been fully balanced with 140cc injector bodies and 15 percent over nozzles. Approximately 50 RWHP over stock. Safe on stock trucks. Excellent for towing applications.
Note: This injector set is intended for vehicles which have the long lead injector in cylinder #8. If you are unsure or do not want to take the time to check then order DDP AD-1
Details:
- Liter: 7.3
- Engine: Powerstroke
- Years: 1999-2003
- Fuel Type: Diesel
- Condition: New
- Not For Sale In California