Product Description
This hydraulic electric unit injector (HEUI) has been thoroughly remanufactured using an exclusive process to ensure optimum quality and reliability. Critical components are replaced and clearances are verified after cleaning, reassembly and testing.
- Ideal replacement - this remanufactured hydraulic electric unit injector (HEUI) restores lost performance from a fouled original equipment injector
- Thoroughly remanufactured - this fuel injector has been completely disassembled, cleaned, inspected, reassembled with new internal components and tested to be leak-free
- Cost-effective solution - offers original equipment quality at competitive price
- Quality tested - this part has undergone extensive testing to ensure a quality fit and long service life
Detailed Applications
Product Specifications
| Attachment Method: | Bolt On |
|---|---|
| Body Material: | Steel |
| Connector Gender: | Female |
| Fuel Injection Type: | Direct Injection |
| Fuel Type: | Diesel |
| Gasket Or Seal Included: | Yes |
| Maximum Outside Diameter: | 40 mm |
| Mounting Hardware Included: | No |
| O-Ring Quantity: | 3 |
| Package Contents: | 1 Injector |
| Package Quantity: | 1 |
| Packaging Type: | Box |
| Retainer Clips Included: | No |
| Terminal Gender: | Male |
| Terminal Quantity: | 2 |
| Terminal Type: | Blade |
OE Numbers
| DIRECT OE CROSS | |
|---|---|
| 5C3Z9VE527ARM | FORD MOTOR COMPANY |
| F61Z-9VE527-ERM | FORD MOTOR COMPANY |
| F81Z 9E527-EARM | FORD MOTOR COMPANY |
| XC3Z-9E527-AARM | FORD MOTOR COMPANY |