null
ALLIANT POWER

ALLIANT AP63804AE NEW AE NUM. 8 INJECTOR FOR 99.5-03 FORD 7.3L POWERSTROKE

(No reviews yet) Write a Review
SKU:
AP63804AE
MPN:
AP63804AE
Shipping:
Calculated at Checkout
$460.80

Description

Specifications
Vendor No.
Alliant Power
Core Item No.
COR65170
Manufacturing Label
New
Gross Weight (LB)
3.09
Country/Region of Origin Code
US
Item UPC/EAN Number
843497104031
No.
APP1338

The Alliant AP63804AE Powerstroke AE Injector is engineered for optimal performance in 1999.5-2003 Ford 7.3L Powerstroke engines. Designed with precision and reliability in mind, this injector boasts a long lead configuration, specifically identified as #8 Long Lead, making it an essential upgrade for your vehicle's diesel injection system.

Manufactured in the USA, this brand-new injector is a testament to quality craftsmanship, ensuring a perfect fit and compatibility with your Powerstroke engine. With a gross weight of 3.09 lbs, it balances durability and efficiency, setting the standard in the aftermarket diesel parts market.

The Alliant AP63804AE features advanced injector technologies that help improve fuel atomization, promoting better combustion efficiency and overall engine performance. By enhancing fuel delivery, this injector helps optimize power output, reduce emissions, and improve throttle response, providing a smoother driving experience. When installed, users can expect improved fuel economy, making it a smart investment for both daily drivers and performance enthusiasts.

Emphasizing reliability, the injector is rigorously tested to meet or exceed OEM specifications, ensuring it can withstand the demands of heavy use in challenging environments. The OEM part number APP1338 links to the injector’s compatibility and performance, offering peace of mind for buyers.

Whether you're looking to replace a faulty injector or enhance your Ford Powerstroke’s performance, the Alliant AP63804AE Powerstroke AE Injector stands out as a premium choice. Upgrade your diesel engine's efficiency and reliability today with this meticulously crafted component, and experience the difference in performance that this injector can deliver.
View AllClose

0 Reviews

View AllClose